REKAPITULASI ANGGARAN BIAYA PEMASANGAN PAVING |
KELURAHAN PANGONGANGAN TAHUN 2017 |
|
|
|
|
|
|
NO |
URAIAN |
VOLUME |
SATUAN |
JUMLAH (RP) |
TOTAL (RP) |
1 |
PEMASANGAN PAVING JL. PANGLIMA SUDIRMAN GG. SEPUHAN |
66 |
M2 |
8.182.544,40 |
8.182.000,00 |
2 |
PEMASANGAN PAVING JL. PANDAN GG. LODAYAN |
70 |
M2 |
12.873.371,36 |
12.873.000,00 |
3 |
PEMASANGAN PAVING JL. A. YANI Gg. PAMONGRINI |
116,5 |
M2 |
14.405.886,15 |
14.406.000,00 |
4 |
PEMASANGAN PAVING JL. METJEN SUNGKONO GG. PANCASILA |
49,5 |
M2 |
6.372.768 |
6.373.000 |
5 |
PEMASANGAN PAVING JL. A. YANI Gg. PRAWIROYUDAN |
50 |
M2 |
6.266.303 |
6.266.000 |
|
JUMLAH |
352 |
M2 |
48.100.872,84 |
48.100.000,00 |
|
DIBULATKAN |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Madiun, Oktober 2017 |
|
Mengetahui |
Menyetujui |
|
Dibuat |
|
Lurah |
Ketua LPMK |
|
TPKK Kel. Pangongangan |
|
Kel.Pangongangan |
Kel.Pangongangan |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Slamet, SH |
M. KAMTO |
|
H. KRISWOTO |
|
NIP. 19670916 199006 1 001 |
|
|
|